Brighton Road
Brighton Road
2no Apartment blocks with 18 dwellings on the site of a pair of semi-detached residential properties.
Drayton Ward
Drayton Ward
Extension & alterations to Drayton Ward - New build and refurbishment of existing building
The Mall Maidstone
The Mall Maidstone
Strip out and refurbishment of a former Pizza Hut Unit in The Mall Maidstone shopping Centre
Pendell Farm
Pendell Farm
Demolition of an existing stable block and construction of a new single storey dwelling.
Refectory Building
Refectory Building
Two storey Front and Rear extensions, new first floor extension, internal alterations and associated works
Reflection Development – Vistry Flats
Reflection Development – Vistry Flats
Internal & External repairs to building fabrics including reroofing 5 blocks
Cornhill, Bury St. Edmunds
Cornhill, Bury St. Edmunds
Conversion of Former Post Office
Andover War Memorial Hospital
Andover War Memorial Hospital
New two-storey building has been constructed to accommodate a relocated GP surgery and dentist
Bucklesham Primary School
Bucklesham Primary School
New Kitchen, Plant room/ Boiler, and store has been constructed including external landscaping and drainage works.
West Suffolk Hospital
West Suffolk Hospital
Front Residences Fire Alarm replacement works
Dorchester Hotel
Dorchester Hotel
Mechanical & Electrical Refurbishment works
1 & 1A Arundel Drive
1 & 1A Arundel Drive
Refurbishment of 2 Nr. properties
Strawberry Fields
Strawberry Fields
New Build Residential 90 bed Care Home over Ground, First and Second floors
New Care Home
New Care Home
New build residential care home
Darwin Green Developments
Darwin Green Developments
59 Apartments and a Library Block
A Library Block Containing 16 Apartments, Two Retail Blocks, Retail A - 21 Apartments, Retail B - 22 Apartments
Wickham Court
Wickham Court
Rectification work to the current roof and balconies at Wickham Court to rectify the leaks.
Midland Air Ambulance Charity
Midland Air Ambulance Charity
Mechanical and Electrical Services have been designed, supplied, installed and tested.
Hellesdon Hospital
Hellesdon Hospital
New Data Centre has been constructed and the installation of Fiber optic ductwork.
Phase 1 - No. 32 High street
Phase 1 - No. 32 High street
Alteration and Extension Works
Guineas (Toilets)
Guineas (Toilets)
Renovation and refurbishment of existing public toilets
Newton Commercial
Newton Commercial
Warehouse Extension
Iron Island Gym
Iron Island Gym
Mechanical & Electrical works
Hoxton Farms
Hoxton Farms
Cat A&B fit out, Laboratory and Office spaces, full new M&E installation, Sprinklers, Fire Alarm and Full soft finishes
Magpas
Magpas
Mechanical and Electrical works
The Glades
The Glades
Mechanical, Electrical and Public Health (MEP) services requirements for the buildings sited on the Glades development
Cornwall House
Cornwall House
Full M&E Design, Install and Commission works
ARK Charter Academy
ARK Charter Academy
Site Boundary and Fencing Works
Part 2 – Building Fabric
Hermitage Lane
Hermitage Lane
Mechanical and BMS installation works including Air Conditioning, Fire Dampers, and Ventilation etc.
Foreign and Commonwealth Office
Foreign and Commonwealth Office
2x vertical coils have been installed in a ductwork system feeding a room called the Locksmiths
Dulwich College
Dulwich College
New chiller and coil has been installed on the roof
Unit 3 Lotus Park
Unit 3 Lotus Park
Cat B Office Fit Out
Pontardulais Comprehensive School
Pontardulais Comprehensive School
Electrical engineering services have been supplied, installed, tested and commissioning.
Blaenymaes Primary School
Blaenymaes Primary School
Electrical Rewire Works Phase 2
The Exchange Mall
The Exchange Mall
Existing lighting has been replaced with the LED fittings
Royal Mail Deptford
Royal Mail Deptford
Mechanical & Electrical works
Stratford School Academy
Stratford School Academy
Mechanical & Electrical works
Alanor Lodge
Alanor Lodge
Single storey extension, Thermal upgrades and internal refurbishment
Site C4 - Kempson Way
Site C4 - Kempson Way
Construction of a new steel framed 2 floor building, with cladding, curtain wall entrance.
Leeds Valley Park
Leeds Valley Park
Mechanical & Electrical installation & PV works to 6Nr. Industrial units.
Jenkins Pavilion Sports & Leisure Centre
Jenkins Pavilion Sports & Leisure Centre
Sandy Jenkins Pavilion Sports & Leisure Centre – Building Expansion
Stamford Endowed Schools
Stamford Endowed Schools
Classroom extensions include dado trunking around the perimeter of the walls & double socket and water & gas around the walls
Tithe Farm Recreation Centre
Tithe Farm Recreation Centre
New sports pavilion has been constructed consists of changing rooms, plant room & club room
Thornes Farm Way
Thornes Farm Way
Operation and Maintenance Manual (Incorporating H&S File) under CDM Regulations 2015
Telemos Capital
Telemos Capital
Full Cat B O&M including M&E
Southwold Employment Hub
Southwold Employment Hub
Design and Construction of Employment Hub with Associated Works
Southwold Residential Flat
Southwold Residential Flat
Design and Construction of Employment Hub with Associated Works
Southwold Retail Unit
Southwold Retail Unit
Design and Construction of Employment Hub with Associated Works
Salvation Army Hall
Salvation Army Hall
Residential dwelling has been converted into a usable office space for the Salvation Army.
Phase 2 & 3 - No. 32 High street
Phase 2 & 3 - No. 32 High street
Internal toilet and access area refurbishments to Cores 1, 2, 3 and 2nd floor – New walls and ceilings compartmentation of area
MPS 9 – Magna Park South
MPS 9 – Magna Park South
Full MEP installation for 3Nr. Warehouses
MPS 10 – Magna Park South
MPS 10 – Magna Park South
Full MEP installation for 3Nr. Warehouses
MPS 11 – Magna Park South
MPS 11 – Magna Park South
Full MEP installation for 3Nr. Warehouses
Lancaster Way Business Park
Lancaster Way Business Park
Mechanical and Electrical works
Great Heck Glass Foaming Plant
Great Heck Glass Foaming Plant
Ventilation WC and Welfare, H&C water services to WC and Welfare, Gas Mains , AC to 2 Rooms, Electrical, Incoming Mains to Main Panel, Electric distribution, Fire alarm, Lighting & Em lighting, External lighting & Lighting Controls.
DWP Swansea
DWP Swansea
Complete fit out of Developers shell for DWP to be used as consultation room
BT Manchester New Bailey
BT Manchester New Bailey
Full M&E Cat B Fit Out Levels Ground, 1st, 5th, 6th, 7th, 8th, 9th 10th Floors
Darenth Valley
Darenth Valley
Olive Ward Hydraulic Separation
University of Bristol
University of Bristol
Boiler room Refurbishment
YARA Ozone Business Park Plot A Howden
YARA Ozone Business Park Plot A Howden
Full M&E Install for a fertiliser production facility and associated office space.
Sapphire Housing Association – Layton Court
Sapphire Housing Association – Layton Court
Layton Court is accessed from Brook Lane North and contains 6 No. properties
SER, MER and Comms Room, BT Manchester
SER, MER and Comms Room, BT Manchester
Full M&E Cat B Fit Out Levels Ground, 1st, 5th, 6th, 7th, 8th, 9th 10th Floors
6no. New Dwellings
6no. New Dwellings
Housing Services (Social Care, Health & Housing) Central Bedfordshire Council
The Perse Upper School
The Perse Upper School
The works comprise the construction of new Science Laboratories and refurbishment of several classrooms of the Science Block for the Perse School in Cambridge.
Culford Preparatory School
Culford Preparatory School
Electrical, Mechanical and Public Health works
Store Room 1 HM Naval Base Davenport
Store Room 1 HM Naval Base Davenport
Existing site has been reconfigured to create a new NER room on the Lower Ground Floor of the Cunnngham Fraser Building.
Whitchurch Hill
Whitchurch Hill
CAT A & CAT B Works in Phase 1 and Phase 2 works
B&Q Cheltenham
B&Q Cheltenham
Decarbonization works
North Lodge
North Lodge
Electrical and Mechanical Installations
Stretham Community Primary School
Stretham Community Primary School
ASHP Installation, Heating re-pipe & Lighting up-gradation
Ridgefield School
Ridgefield School
Installation of 2 New ASHP’s and Plantroom Pipework
Foreign, Commonwealth & Development Office
Foreign, Commonwealth & Development Office
Removal of current radiators, Installation of Fan coil units & MVHR within office space.
Heath Primary School
Heath Primary School
Windows and Doors Replacement works
Schneider Electric Factory
Schneider Electric Factory
Full M&E installation lighting / Controls & power mains distribution , Fire & Aspiration systems, IT Data heating cooling , BMS system ventilation plumbing works , sprinkler system
Royal Marines Poole
Royal Marines Poole
Modular Boiler House for New Heat Source
Unit 2, Symmetry Park
Unit 2, Symmetry Park
Operation and Maintenance Manual (Incorporating H&S File) under CDM Regulations 2015
Fradley Park Industrial Limited
Fradley Park Industrial Limited
Operation and Maintenance Manual (Incorporating H&S File) under CDM Regulations 2015
Foreign, Commonwealth & Development Office
Foreign, Commonwealth & Development Office
New HIU’s and 2Nr. PHX’s have been installed. Basement plantroom, section of cooling tower primary pipework has been replaced. New pipework and condensers have also been installed.
Leeds City College (LCC) Mabgate Campus
Leeds City College (LCC) Mabgate Campus
Operation and Maintenance Manual (Incorporating H&S File) under CDM Regulations 2015
Hethersett Academy
Hethersett Academy
Mechanical and Electrical services to New H Block.
Grays Convent High School
Grays Convent High School
Operation and Maintenance Manual (Incorporating H&S File) under CDM Regulations 2015
Dept. of Chemical Engineering and Biotechnology
Dept. of Chemical Engineering and Biotechnology
Operation and Maintenance Manual (Incorporating H&S File) under CDM Regulations 2015
UoC - Dept. of Chemistry
UoC - Dept. of Chemistry
Boiler Replacement
Brentwood Ursuline Convent High School
Brentwood Ursuline Convent High School
Operation and Maintenance Manual (Incorporating H&S File) under CDM Regulations 2015
Learie Constantine Centre
Learie Constantine Centre
Operation and Maintenance Manual (Incorporating H&S File) under CDM Regulations 2015
Kings Cross Hospital
Kings Cross Hospital
Operation and Maintenance Manual (Incorporating H&S File) under CDM Regulations 2015